Plumbing

Water Heater Replacement Cost & Quote Checker

Create a replacement-cost range for tank, tankless, heat-pump, gas, or electric water heaters and compare an itemized quote.

Free to useRuns locallyNo contact details
Project details

Build your estimate

Change any field. Results update locally in your browser.

Your entries stay on this device. No form is submitted.
Independent planning report

Quote review

Within estimated range
Modeled planning range$1,300$2,650
Typical modeled cost$2,000
Your quote$2,100
Metro basisChicago-Naperville-Elgin, IL-IN
Service-cost factor1.036×

BEA 2024 RPP · released Feb 2026. The factor applies only to marked labor and field-service components, not equipment.

The quote falls inside the modeled planning range.

$1,300$2,650
Lower scopeModeled rangeHigher scope

Cost breakdown

ComponentLowHigh
Water heater and standard materials$650$1,100
Removal and installation laborRegional service factor applied$450$950
Permit and inspection allowance$100$350
Haul-away and startupRegional service factor applied$100$250
Modeled total$1,300$2,650
Address-level permit and rules check

Plumbing, fuel-gas, electrical, energy, venting, seismic, drain-pan, expansion-control, and inspection rules vary by adopted state and local code. ZIP alone cannot identify the exact authority having jurisdiction; confirm the street address with the city or county permit office.

This is a consumer planning model, not a contractor bid. Taxes, permits, hidden conditions, premium equipment, and unusual access can change the final price.

01

Why this result

  • Tank capacity, fuel type, efficiency, and installation conditions affect the equipment package.
  • Only labor and field-service allowances receive the displayed regional price-level adjustment.
02

What may be missing

  • Exact model, efficiency, first-hour rating, or tankless flow at the required temperature rise
  • Expansion tank, drain pan, seismic restraint, condensate, venting, disconnect, and gas shutoff
  • Address-level permit, inspection, and utility requirements
  • Old-unit haul-away and finish work
03

Before you sign

  • For tankless equipment, compare the manufacturer's GPM table at your winter inlet-water temperature.
  • Ask whether code upgrades are fixed prices or allowances.
  • Confirm the project address with the plumbing/building authority and verify permit, inspection, disposal, and cleanup responsibilities.