Quote review
BEA 2024 RPP · released Feb 2026. Marked trade-labor rows use a weighted BLS occupational-wage and BEA regional-price adjustment when the validated public snapshot is available. Equipment is not multiplied by a local wage factor.
Moderate planning basis
Useful as a first-pass range, but one or more local or physical-scope inputs still need an onsite inspection or permit-office confirmation.
5.5% above the high end. Ask for an itemized explanation of the difference.
Cost breakdown
| Component | Low | High |
|---|---|---|
| Matched equipment package | $3,200 | $6,800 |
| Removal and installation laborBEA regional planning proxy: 1.036× | $1,550 | $3,100 |
| Permit and inspection allowance | $150 | $400 |
| Startup, testing, and disposalBEA regional planning proxy: 1.036× | $150 | $350 |
| Lineset, pad, controls, and standard materials | $300 | $1,200 |
| Modeled total | $5,350 | $11,850 |
Mechanical, electrical, fuel-gas, energy-code, refrigerant, and inspection rules are adopted by state and local authorities. A ZIP identifies a price region, not the exact authority having jurisdiction (AHJ). Confirm the project address with the city or county permit office before work.
Source periods and confidence basis
- BEA 2024 RPP · released Feb 2026
- The public live-data snapshot is unavailable; national ranges and the embedded BEA regional proxy remain in use.
- ZIP matched a residential regional-price row.
- The selected scope is within the model's ordinary residential planning envelope.
This is a consumer planning model, not a contractor bid. Taxes, permits, hidden conditions, premium equipment, and unusual access can change the final price.